Plans to install meters at the EV charging points.

Update: Approved the physical change of the Pavilion charger to one that can be chargeable, then roll out to the other locations (software to be upgraded).

Locations:

  • Pavilion – two

  • Birch Close - two

  • Almond Close – two

  • Ash Lane - none

  • Walnut Lane – five

The existing power supply precludes adding additional charging points but we are looking at having an additional sub-station.

Previous
Previous

Residents Meeting AOB

Next
Next

Greenhouse Restaurant Update